Our Pods Have Revolutionised The Construction Industry

Here is Why

TIME-SAVING
Construction time is reduced by 30%, primarily thanks to shorter production and on-site installation times.
THE QUALITY
Carefully-selected materials with exhaustive inspections before the pod leaves the plant for integration in a project. Guaranteed long-lasting components!
THE SPEED
Thanks to faster construction and a better design with long-lasting quality, both immediate and future costs are reduced for any given project.
THE SAFETY
Working conditions are improved and safer at the production plant, meeting the various safety requirements to avoid hazards at the worksite.
THE SIMPLICITY
Simplified project management, both in the early stages and at the construction site : one single contact for your entire bathroom batch, and fewer tradesmen to be coordinated.
THE MODULARITY
A dry construction method, less waste generated at the site and less disturbance for a more environmentally sensitive worksite.

Our Areas Of Speciality

Our Process

  • Initialisation

    Baudet UK get involved from the conception stage and our design team works through ideas with the architects/planners.

  • Installation

    If the installation is requested, our team will provide a cost for this service. Our team of professionals will attend site for each delivery and install the pods over several site visits.

  • Designing

    Once the design is complete we then offer up our recommendations for fixtures and fittings and internal finishes. As our client you have a wide choice when it comes to additional extras to choose from to suit the preference and budget of the project.

  • Planning

    The specification of the bathroom is agreed the order is complete and we just require the delivery dates and program duration.

  • QA

    Once the bathrooms are all installed, our project manager will attend the site and carry out all QA checks and sign off the project for handover.

  • Aftersales Service

    We have an excellent aftercare service and supply any replacement parts for the pods as and when requested by the building management team.